中文字幕人妻色偷偷久久_天天鲁一鲁摸一摸爽一爽_最新亚洲人成网站在线观看_999久久久免费精品国产_久久精品丝袜高跟鞋

歡迎訪一網(wǎng)寶!您身邊的知識小幫手,專注做最新的學習參考資料!
首頁 > 其他 >

國際英語新聞:Brazilian president vetoe

一網(wǎng)寶 分享 時間: 加入收藏 我要投稿 點贊

KHARTOUM, July 3 (Xinhua) -- Talks between Sudan, Egypt and Ethiopia over the Grand Ethiopian Renaissance Dam (GERD) on the Nile River were resumed on Friday under the African Union mediation, Sudan's Irrigation and Water Resources Ministry announced.

"The talks between the three countries were resumed on Friday via video conference with mediators and monitors attending," said the ministry in a statement.

The tripartite talks are expected to abide by the Declaration of Principles previously signed by the three countries as a basis for formulating all technical and legal items that lead to a final deal.

In March 2015, leaders of the three countries signed the declaration committed to reaching an agreement regarding the GERD through cooperation.

In June, the tripartite talks stalled over technical and legal differences.

Ethiopia started building the GERD in 2011, while Egypt, a downstream Nile Basin country that relies on the river for its fresh water, is concerned that the dam might affect its 55.5-billion-cubic-meter annual share of the water resources.

精選圖文

221381
領取福利

微信掃碼領取福利

微信掃碼分享

Z范文網(wǎng)、范文協(xié)會網(wǎng)范文檔案館、